The out side wall is insulated and basically all dry walled. Floor is up and small walls are being finished to be ready for drywall, which we are picking up Wed. Tile floor is going down Next Monday!
This is the tile for the floor. The color is deeper in person, the flash on the camera made it lighter. 12x12 tiles.
No comments:
Post a Comment
Thanks for visiting my blog. I love to read all your comments!